1. Calculate
Choose your project scope and see the estimated price range.
Price a 2026 post-construction clean by phase, square footage, dust level, windows and rush date, then line up three local cleaning crews.
Instant project estimate
The estimate is free. Additional details are optional.
Complete the project details and calculate to see a price range and next steps.
Clear next step
Choose your project scope and see the estimated price range.
Understand the cost drivers and what impacts your final quote.
Carry your scope into a local quote request if you choose.
Post-construction cleaning costs about $0.15 to $0.60 per square foot for one clean and up to $1.05 for all three phases in 2026. A 2,000 sq ft final clean runs roughly $550 to $1,500, and drywall dust, windows and rush work push it higher.
Cost guides put post-construction cleaning at about $0.15 to $0.40 per square foot for a rough clean and $0.20 to $0.60 for a final clean in 2026. A touch-up before move-in is cheaper, and doing all three phases runs roughly $0.40 to $1.05. Add a crew minimum of $100 to $600, so a 2,000 sq ft house final clean lands near $550 to $1,500.
| Clean | Per sq ft | 2,000 sq ft house |
|---|---|---|
| Rough clean | $0.15 to $0.40 | $400 to $1,050 |
| Final clean | $0.20 to $0.60 | $550 to $1,500 |
| Touch-up clean | $0.08 to $0.25 | $235 to $700 |
| All three phases | $0.40 to $1.05 | $1,050 to $2,700 |
A rough clean removes debris and the worst dust so other trades can keep working: scrap, packaging, sweeping and vacuuming. A final clean comes after drywall, paint, flooring and fixtures are done and wipes every surface, the inside of cabinets and drawers, fixtures, glass and floors. A touch-up visit catches dust that settles in the days before you move in.
Usually only a rough or "broom clean" is included. That means the contractor sweeps up debris, removes tools and signs, and hauls trash, but fine drywall dust is still on every shelf, vent and window sill. A final clean is often a separate line item, an allowance, or left to the owner, so check the contract wording before the last payment.
Yes, if the system ran while drywall was sanded, fine dust gets into return vents, filters and ductwork. The usual fix is to change the filters and wipe the registers, which costs about $50 to $200 as an add-on. A full air duct cleaning costs roughly $300 to $1,000 and is worth it if the system ran during sanding or you see dust blowing from the vents.
A two-person crew often needs about 6 to 10 hours for a final clean of a 2,000 sq ft house, and a new build with heavy dust can take a full day or two with a larger crew. Booking within a week of your closing or move-in adds about 15% to 30%, and next-day or weekend work adds about 30% to 60% in our estimate.
Inputs
Result
A final clean at $0.20 to $0.60 per sq ft is $400 to $1,200 for 2,000 sq ft. The $150 to $300 crew fee brings it to $550 to $1,500, and no multiplier applies to a normal-dust remodel on a standard schedule.
Inputs
Result
All three phases at $0.40 to $1.05 per sq ft is $960 to $2,520 for 2,400 sq ft, plus the $250 to $600 crew fee. The new-build and heavy-dust factors lift that to $1,664 to $6,084, then windows ($250 to $600) and filters and vents ($50 to $200) are added.
Inputs
Result
A 3,000 sq ft final clean is $600 to $1,800 of work plus the $150 to $300 crew fee. Commercial space (0.9 to 1.2) and a rush booking (1.15 to 1.3) lift that to $776 to $3,276, then a few windows add $100 to $250.
Cost = (Sq ft x Rate per sq ft + Crew fee) x Project x Dust x Space x Rush + ExtrasEach phase is priced per square foot plus a flat crew fee. Project type, dust level, space type and rush booking multiply that subtotal. Windows, sticker and paint removal, HVAC cleaning and debris hauling are flat add-ons at the end.
Where:
Rate per sq ft= Rough $0.15 to $0.40, final $0.20 to $0.60, touch-up $0.08 to $0.25, all three $0.40 to $1.05Crew fee= Minimum crew visit: $75 to $600 depending on the phasesProject= 1.0 for a room remodel, 1.05 to 1.2 whole-house, 1.1 to 1.3 new buildDust and rush= Dust 0.85 to 1.5; rush 1.0, 1.15 to 1.3 within a week, 1.3 to 1.6 next dayExtras= Windows $100 to $1,200, residue $50 to $600, HVAC $50 to $1,000, hauling $75 to $700Post-construction cleaning is priced by the square foot, and the rate depends on which phase you book. Cost guides report about $0.15 to $0.40 per square foot for a rough clean and $0.20 to $0.60 for a final clean, with all three phases together around $0.40 to $1.05 in our estimate. These are ranges reported by cost guides, not quotes, and sources disagree by a wide margin, so treat them as a starting point for bids.
Cleaners also charge a minimum, because even a small job needs a crew to show up with equipment. We add a flat crew fee of $100 to $300 for a single phase and $250 to $600 for all three, then apply your project type, dust level and schedule. For a 2,000 sq ft house, that puts a final clean at about $550 to $1,500, in line with the national averages of roughly $480 to $650 that cost guides report for typical jobs. Small jobs such as a single bathroom can fall under $300, while a large renovated home can pass $2,500.
Labor makes up most of the bill. One Angi city page puts it near 90% of the total, which is why a dusty new build costs more than a tidy remodel of the same size: the crew simply spends more hours. If your project is only a kitchen or bathroom, enter the floor area that was actually touched, plus the rooms the dust spread to, not the whole house, and compare the result with our deep cleaning calculator for a lived-in home. Remember that a house cleaning crew and a post-construction crew are priced differently, because construction dust needs HEPA vacuums, extra rags and more time per room.
| Scenario | Typical cost (2026) | What drives it |
|---|---|---|
| 1,000 sq ft final clean, remodel | $350 to $900 | $0.20 to $0.60 per sq ft plus crew fee |
| 2,000 sq ft final clean, remodel | $550 to $1,500 | Same rate, larger floor area |
| 2,000 sq ft rough clean | $400 to $1,050 | Debris and sweeping, no detail work |
| 2,000 sq ft touch-up clean | $235 to $700 | Dust that settled after trades left |
| 2,000 sq ft all three phases | $1,050 to $2,700 | Rough, final and touch-up bundled |
| 3,000 sq ft small commercial final | $750 to $2,100 | Before rush and glass add-ons |
Ask every cleaner for the rate per square foot and the minimum visit fee separately. A single lump sum hides whether you are paying for area or for setup.
A rough clean happens while other trades are still working. The crew carries out scrap wood, drywall offcuts and packaging, sweeps and vacuums floors, and clears dust from the worst surfaces so flooring, paint and cabinet crews can keep moving. It costs $0.15 to $0.40 per sq ft in cost guides, and on a larger job it is often done twice, once after framing and once after drywall. Our estimate treats it as one visit. Ask the cleaner whether the rough clean includes a first vacuum of subfloors, since that step makes later dust easier to control.
The final clean is the one homeowners usually pay for. It comes after paint, flooring, cabinets and fixtures are installed, and covers wiping every horizontal surface, the inside of cabinets and drawers, light fixtures, baseboards, door frames, sinks and tubs, mirrors and glass, and a full vacuum and mop. Rates run $0.20 to $0.60 per sq ft. The order of work is usually top to bottom, so ceilings and fixtures come before floors. Windows and tracks, sticker removal and HVAC work are often extras, and our window cleaning calculator prices the glass on its own.
A touch-up clean is a short visit just before move-in or closing. Final-clean dust settles again after the plumber, electrician or flooring crew comes back for punch-list fixes, so a crew wipes the visible surfaces, spot-cleans floors and checks the glass. Sources disagree on price, from $0.06 per sq ft to $0.60, so we use $0.08 to $0.25 and a $75 to $200 minimum visit. Booking all three phases together from one company usually costs less than three separate calls. It also means one crew learns the house, so the later visits go faster.
Cost guides agree that new construction costs more to clean than a renovation, because a new house has every surface to clear and a lot more debris. The size of the step is not published, so we use +10% to +30% for a new build and +5% to +20% for a whole-house renovation, with a few-room remodel as the baseline. On a 2,000 sq ft final clean, that moves the $550 to $1,500 range to about $605 to $1,950 for a new build. A whole-house renovation with the same size and dust lands in between.
Dust is the bigger lever. Sanding drywall joint compound produces a fine powder that travels through the whole house, settles on shelves and gets into vents, and a broom cannot pick it up. It is also the reason some crews vacuum walls and ceilings before they touch the floors. We use 0.85 to 0.95 for a light-dust job, a baseline of 1.0, and 1.25 to 1.5 for heavy sanding, plaster, or concrete and tile cutting. The same 2,000 sq ft final clean would run roughly $690 to $2,250 with heavy dust.
Square footage should be the area that needs cleaning, not the lot size. A garage, unfinished basement or attic that no one touched usually costs less or nothing, while finished areas near the work zone share the dust. For a remodel, count the work rooms and any open adjoining space. If an old mess is also involved, such as a cluttered home or a sale, a house cleaning calculator or move-out cleaning calculator fits that part better. Keep the two jobs separate on the bid so you can see what each costs.
Dust control during the job is cheaper than dust cleanup afterward. Ask your contractor to tape off return vents and seal the work zone with plastic before sanding.
Windows are the biggest common add-on. New windows arrive with stickers and labels, and glass picks up paint specks, plaster and adhesive that needs a razor scraper, plus the tracks and sills fill with grit. Plan on the crew needing extra time for the tracks, which hold sawdust and plaster. We add $100 to $250 for up to 10 panes, $250 to $600 for a typical house of 11 to 25 panes, and $500 to $1,200 for 26 or more. These add-ons are our estimates, so compare them with the window cleaning calculator and your own pane count.
Stickers, paint splatter and adhesive on tile, glass, fixtures and hardware cost $50 to $150 when light and $200 to $600 when every window carries a sticker and the floor has paint drips. Crews use razor scrapers and solvents carefully, which is slow work, so the cost rises with the number of items. Cleaners also charge more per item when the scraping is slow, so a handful of labeled panes costs little. Carpets that picked up dust and plaster may need a separate clean, which our carpet cleaning calculator prices separately.
Drywall dust in the HVAC is the item homeowners forget. If the system ran while drywall was sanded, dust sits in the return vents, the filter and the first stretch of ductwork. Changing filters and wiping registers adds roughly $50 to $200, while a full duct cleaning costs about $300 to $1,000 in our estimate. Use the air duct cleaning calculator for a sharper number, and change the filter again a few weeks after move-in. If the house is new and tight, a second filter change after a month catches the dust that was still in the air at move-in.
| Add-on | Typical add (2026) | Notes |
|---|---|---|
| Windows, up to 10 panes | $100 to $250 | Glass, sills and tracks |
| Windows, 11 to 25 panes | $250 to $600 | Typical whole house |
| Windows, 26+ panes | $500 to $1,200 | Large glass or commercial |
| Stickers and paint, light | $50 to $150 | A few specks and labels |
| Stickers and paint, heavy | $200 to $600 | Every window, adhesive, drips |
| HVAC filters and vents | $50 to $200 | Filter change and register wipe |
| Full duct cleaning | $300 to $1,000 | If the system ran during sanding |
Most building and remodeling contracts promise only a "broom clean" at the end of the job. That means the crew removes tools, signs and debris and sweeps the floors, and it does not promise a dust-free house. Cleaning companies note that fine drywall dust stays behind after a broom clean, because a broom cannot capture it. If your contract uses these words and nothing more, expect to hire the final clean yourself.
Some contractors include a final clean, either as a line item or as an allowance. Read it closely: "final clean" can mean mopping the floors, or it can mean wiping the inside of every cabinet, the windows and the vents. Ask for the scope in writing, ask whether windows, tracks, cabinet interiors and HVAC registers are covered, Ask too whether the cleaner brings a vacuum with a HEPA filter, because ordinary vacuums blow fine dust back into the room. Our dumpster rental calculator shows what a hauling bill looks like if it is billed separately.
If the cleaning is the contractor's job and it falls short, the usual lever is the last payment. Holding back 5% to 10% of the contract price until the work is done is a common remedy, though the exact terms depend on your contract and your state, so ask an attorney or your state's contractor board before withholding anything. Keep dated photos of what was left dirty. On a new house from a builder, the builder's cleaning is typically followed by a punch-list walk-through, and a touch-up clean should come after that list is finished. That order keeps you from paying for a clean that the next repair visit undoes.
Add one sentence to the contract before work starts: "Contractor will deliver the home broom clean with drywall dust removed from all surfaces." It costs nothing to ask and settles the argument later.
Crew size and hours explain the price. In our estimate a two-person crew needs about 6 to 10 hours for a 2,000 sq ft final clean, so at a labor rate of $30 to $60 per cleaner-hour the work lands at about $360 to $1,200, close to the per-square-foot range. A dusty new build might need four or five cleaners and a day or two, which is why bids rise sharply for heavy dust. Bring this up early, since the number of cleaners also changes how fast the house can be handed over.
Rush booking costs extra. If your closing or move-in date is within a week, cleaners may need to move other jobs, and we add about 15% to 30%. Next-day or weekend work adds roughly 30% to 60%. A crew that is booked in advance is also less likely to cancel. The best cure is booking the final clean before you have a date pressure: ask the contractor for the expected finish day, and reserve a crew for the day after, then a touch-up two or three days before you move in.
To compare bids, get three written quotes on the same scope. Each should state the phases, the square footage, what is included for windows, cabinet interiors, HVAC and debris, the number of cleaners, and the hours. Ask whether the price is a flat fee or hourly and whether the company is insured. Check the pricing against this calculator, and if one bid is below half the low end, ask what has been left out. A cheap bid that skips windows can end up costing more than a full-scope one. Pay by invoice or card, get the final price in writing, and keep the receipt in case you need it for a warranty claim or a home sale.
Read our guide
Read our guide
Price renovation, cleanup and finishing work before you collect contractor bids.
Last Updated: Nov 26, 2026
This calculator is provided for informational and educational purposes only. Results are estimates and should not be considered professional financial, medical, legal, or other advice. Always consult a qualified professional before making important decisions. UseCalcPro is not responsible for any actions taken based on calculator results.